Difference between revisions of "Adding a sensor"
From Senfi Docs
(Marked this version for translation) |
|||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
<!--T:1--> | <!--T:1--> | ||
To Start adding a sensor, you need to do the following: | To Start adding a sensor, you need to do the following: | ||
− | # Site that | + | # Ensure Site that sensor is to be located is already created. If not, Please [[Adding_a_site|Create Site]]. |
# Note down measurement that Sensor produces. (Managed Sensor) | # Note down measurement that Sensor produces. (Managed Sensor) | ||
Latest revision as of 17:03, 25 October 2019
To Start adding a sensor, you need to do the following:
- Ensure Site that sensor is to be located is already created. If not, Please Create Site.
- Note down measurement that Sensor produces. (Managed Sensor)
Add new Sensor
- Login to the CMS
- Go to the Sensor tab
- Click the + button
- Add Sensor Name
- Select Site
- Select Building, Block, Level (Optional)
- Choose Unmanaged Sensor or Managed Sensor
- Managed Sensor
- Select Measurement that noted down previously
- Add Tags value that required for identification
- Unmanaged Sensor
- Add iFrame Source
- Click icon image to change the default icon
- Click EDIT LOCATION button to enter edit mode
- Move mouse in the 3D/2D view to place the sensor
- Single click to confirm the location of the sensor
- Click SAVE