V2/CMS Tutorial/User Tools/Creating Content/Measurement/Computed Measurement
From Senfi Docs
Revision as of 11:38, 28 June 2021 by Elysia.Tan (talk | contribs)
Add Computed Measurement
Note: Mandatory fields are marked with an ‘*’. The following steps assume that the user is already logged in to the CMS.
Steps
- Go to the Measurement tab and select ADD NEW.
- Fill in the necessary fields (E.g. Name, Tags, Code etc.).
- There must at least be one required tag selected.
- Set the Data Retention (days) of the measurement.
- Data Retention (days): Number of days data for the measurement should be stored in the CMS after it has been received.
- Choose Computed Measurement measurement type and select NEXT (bottom).
- Add METRIC (at least one).
- Lift:
- Check the Has lift metrics box.
- Movable:
- Check the Has movable metrics box.
- General:
- Fill in the Name, Code and Type.
- Set the readability and writability of the metric.
- Select ADD NEW.
- Add Script to compute the measurement.
- Select SUBMIT (top right corner) to add the computed measurement.