Difference between revisions of "V2/Concepts/Preparing for Measurement Creation"
From Senfi Docs
Line 4: | Line 4: | ||
You should | You should | ||
− | * | + | * Note down the metrics from the incoming source. Check if the metrics has units |
+ | * Decide on the measurement code to use. | ||
+ | * Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics. | ||
+ | * Decide on the data retention period. | ||
+ | * Decide on the access group to assign. | ||
=== Pre-requisites to create a Computed Measurement === | === Pre-requisites to create a Computed Measurement === | ||
Line 17: | Line 21: | ||
* Have the computed measurement script ready. | * Have the computed measurement script ready. | ||
* (Optional) Have a set of test data for your computed measurement | * (Optional) Have a set of test data for your computed measurement | ||
+ | * Decide on the data retention period. | ||
+ | * Decide on the access group to assign. | ||
==== What's Next ==== | ==== What's Next ==== |
Revision as of 14:53, 25 June 2021
Contents
What is needed to create a Measurement/Computed Measurement
Pre-requisites to create a Measurement
You should also be similar with the basic measurements and its concepts. Please read this section if you require a refresher.
You should
- Note down the metrics from the incoming source. Check if the metrics has units
- Decide on the measurement code to use.
- Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics.
- Decide on the data retention period.
- Decide on the access group to assign.
Pre-requisites to create a Computed Measurement
A computed measurement requires design and scripting in order for it to work correctly. If this is your first time creating a computed measurement, please read this guide first.
You should also be similar with the basic measurements and its concepts. Please read this section if you require a refresher.
You should
- Note down the input measurements.
- Note down the metrics you want to output.
- Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics.
- Have the computed measurement script ready.
- (Optional) Have a set of test data for your computed measurement
- Decide on the data retention period.
- Decide on the access group to assign.
What's Next
- Start creating your own Measurement
- Learn about Asset