Difference between revisions of "V2/Concepts/Preparing for Measurement Creation"
From Senfi Docs
Elysia.Tan (talk | contribs) |
Elysia.Tan (talk | contribs) |
||
Line 16: | Line 16: | ||
A computed measurement requires design and scripting in order for it to work correctly. If this is your first time creating a computed measurement, please read [[V2/Concepts/Intro_to_Computed_Measurement|this guide]] first. | A computed measurement requires design and scripting in order for it to work correctly. If this is your first time creating a computed measurement, please read [[V2/Concepts/Intro_to_Computed_Measurement|this guide]] first. | ||
− | You should also be similar with the basic [[V2/Concepts/Intro_to_Measurement|measurements]] and its concepts | + | You should also be similar with the basic [[V2/Concepts/Intro_to_Measurement|measurements]] and its concepts. |
You should | You should |
Revision as of 18:34, 6 August 2021
Contents
What is needed to create a Measurement/Computed Measurement
Please read this section if you require a refresher on Measurements and Computed Measurements.
Pre-requisites to create a Measurement
You should be familiar with the basic measurements and its concepts.
You should
- Note down the metrics from the incoming source. Check if the metrics has units
- Decide on the measurement code to use.
- Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics.
- Decide on the data retention period.
- Decide on the access group to assign.
Pre-requisites to create a Computed Measurement
A computed measurement requires design and scripting in order for it to work correctly. If this is your first time creating a computed measurement, please read this guide first.
You should also be similar with the basic measurements and its concepts.
You should
- Note down the input measurements.
- Note down the metrics you want to output.
- Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics.
- Have the computed measurement script ready.
- (Optional) Have a set of test data for your computed measurement
- Decide on the data retention period.
- Decide on the access group to assign.
What's Next
- Start creating your own Measurement
- Learn about Asset