Difference between revisions of "V2/Concepts/Preparing for Measurement Creation"
From Senfi Docs
m (typo changed: "metrics has" changed to "metrics have", "if the metric contains" changed to "if each metric contains".) |
|||
(8 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<h1 class="main-heading">What is needed to create a Measurement/Computed Measurement</h1> | <h1 class="main-heading">What is needed to create a Measurement/Computed Measurement</h1> | ||
− | === Pre-requisites to create a | + | Please read [[V2/Concepts/Measurement|this section]] if you require a refresher on Measurements and Computed Measurements. |
+ | |||
+ | === Pre-requisites to create a Measurement === | ||
+ | You should be familiar with the basic [[V2/Concepts/Intro_to_Measurement|measurements]] and its concepts. | ||
+ | |||
+ | You should | ||
+ | * Note down the metrics from the incoming source. Check if the metrics have units. | ||
+ | * Decide if each metric contains brick point class. | ||
+ | * Decide on the measurement code to use. | ||
+ | * Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics. | ||
+ | * Decide on the data retention period. | ||
+ | * Decide on the access group to assign. | ||
+ | |||
+ | === Pre-requisites to create a Computed Measurement === | ||
A computed measurement requires design and scripting in order for it to work correctly. If this is your first time creating a computed measurement, please read [[V2/Concepts/Intro_to_Computed_Measurement|this guide]] first. | A computed measurement requires design and scripting in order for it to work correctly. If this is your first time creating a computed measurement, please read [[V2/Concepts/Intro_to_Computed_Measurement|this guide]] first. | ||
− | + | You should also be similar with the basic [[V2/Concepts/Intro_to_Measurement|measurements]] and its concepts. | |
− | You should also be similar with the basic [[V2/Concepts/Intro_to_Measurement|measurements]] and its concepts | ||
− | |||
You should | You should | ||
* Note down the input measurements. | * Note down the input measurements. | ||
Line 14: | Line 25: | ||
* Have the computed measurement script ready. | * Have the computed measurement script ready. | ||
* (Optional) Have a set of test data for your computed measurement | * (Optional) Have a set of test data for your computed measurement | ||
+ | * Decide on the data retention period. | ||
+ | * Decide on the access group to assign. | ||
+ | |||
+ | ==== What's Next ==== | ||
+ | ----- | ||
+ | * Start [[V2/CMS_Tutorial/User_Tools/Creating_Content/Measurement|creating your own Measurement]] | ||
+ | * Learn about [[V2/Concepts/Asset|Asset]] |
Latest revision as of 07:52, 4 April 2022
Contents
What is needed to create a Measurement/Computed Measurement
Please read this section if you require a refresher on Measurements and Computed Measurements.
Pre-requisites to create a Measurement
You should be familiar with the basic measurements and its concepts.
You should
- Note down the metrics from the incoming source. Check if the metrics have units.
- Decide if each metric contains brick point class.
- Decide on the measurement code to use.
- Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics.
- Decide on the data retention period.
- Decide on the access group to assign.
Pre-requisites to create a Computed Measurement
A computed measurement requires design and scripting in order for it to work correctly. If this is your first time creating a computed measurement, please read this guide first.
You should also be similar with the basic measurements and its concepts.
You should
- Note down the input measurements.
- Note down the metrics you want to output.
- Decide on a set of tags to use or re-use. Make sure that there is a combination of tags that will uniquely identify the unit/device/equipment that outputs those metrics.
- Have the computed measurement script ready.
- (Optional) Have a set of test data for your computed measurement
- Decide on the data retention period.
- Decide on the access group to assign.
What's Next
- Start creating your own Measurement
- Learn about Asset